Gas, Plumbing and Electrical Permits

Source: IJD Inspections Ltd.


Gas Permit Applications

In order to issue a gas permit, the applicant must submit:

  • Completed permit application
  • Method of payment

Gas Permit Application Form
 

Eligibility

  • For a single-family dwelling, the applicant may be the owner and occupant of the property or may be a Certified Gas Contractor.

Site Inspection Stages

  • Final Inspection: Project is complete

Please provide 48 hours notice to arrange for the necessary inspections.


Plumbing Permit Applications

In order to issue a plumbing permit, the applicant must submit:

  • Completed permit application
  • Method of payment

Plumbing Permit Application Form

Eligibility

  • For a single-family dwelling, the applicant may be the owner and occupant of the property or may be a Certified Plumbing Contractor.

Typical Site Inspection Stages

  • Rough-in Below Grade Inspection: Prior to covering
  • Rough-in Above Grade Inspection: Prior to covering
  • Final Inspection: Project is complete

Please provide 48 hours notice to arrange for the necessary inspections.


Electrical Permit Applications              

In order to issue an electrical permit, the applicant must submit:
  • Completed permit application
  • Method of payment

Eligibility
  • For a single-family dwelling, the applicant may be the owner and occupant of the property or may be a contractor who holds a Master Electrician Certificate. Service must be 100 amps or less for a home-owner permit.
Typical Site Inspection Stages
  • Rough-in Inspection: Prior to covering
  • Final Inspection: Project is complete
Please provide 48 hours notice to arrange for the necessary inspections.
Inspection Stages
1 .Rough-in Inspection
  • Meter base, service panel, service conductors and grounding must be installed.
  • All outlet boxes are to be mounted and secured in such a manner that they will be flush with finished walls and ceilings.
  • All wiring installation in outlet boxes and splices must be completed.
  • All ground wires are to be attached to the outlet boxes and spliced as required.
2. Final Inspection
  • All wiring devices (switch, receptacles, fixtures, and wall plates) installed.
  • All branch circuits wiring to be installed in panel and connected to the circuit breakers.
  • Panel directory to be properly labeled.
  • Gas and water lines to be bonded to ground.